{"ob_id":30757,"uuid":"9b97174d8406432a91db4c8b0a594412","title":"the HAMMOZ-Consortium team running: experiment piControl using the MPI-ESM-1-2-HAM model.","abstract":"The the HAMMOZ-Consortium team team consisted of the following agencies: Swiss Federal Institute of Technology Zurich (ETH-Zurich), Max Planck Institute for Meteorology (MPI-M), Forschungszentrum Jülich, University of Oxford, Finnish Meteorological Institute (FMI), Leibniz Institute for Tropospheric Research (IfT) and Center for Climate Systems Modeling (C2SM) at ETH Zurich.the HAMMOZ-Consortium team running the \"pre-industrial control\" (piControl) experiment using the MPI-ESM-1-2-HAM model. See linked documentation for available information for each component.","keywords":"CMIP6, WCRP, climate change, HAMMOZ-Consortium, MPI-ESM-1-2-HAM, piControl, AERmonZ, Amon, Lmon, Omon, Oyr, SImon","inputDescription":null,"outputDescription":null,"softwareReference":null,"identifier_set":[]}