{"ob_id":30814,"uuid":"6182866b0456414990195a70685dea94","title":"Max Planck Institute for Meteorology (MPI-M) running: experiment piControl using the MPI-ESM1-2-HR model.","abstract":"Max Planck Institute for Meteorology (MPI-M) running the \"pre-industrial control\" (piControl) experiment using the MPI-ESM1-2-HR model. See linked documentation for available information for each component.","keywords":"CMIP6, WCRP, climate change, MPI-M, MPI-ESM1-2-HR, piControl, 3hr, 6hrLev, 6hrPlev, 6hrPlevPt, AERmon, AERmonZ, Amon, CF3hr, CFday, CFmon, E3hr, E3hrPt, Eday, EdayZ, Emon, Lmon, Oday, Ofx, Omon, Oyr, SIday, SImon, day, fx","inputDescription":null,"outputDescription":null,"softwareReference":null,"identifier_set":[]}