{"ob_id":31078,"uuid":"5c5a7e68e4cf43a3835179ac396975dc","title":"Max Planck Institute for Meteorology (MPI-M) running: experiment control-1950 using the MPI-ESM1-2-XR model.","abstract":"Max Planck Institute for Meteorology (MPI-M) running the \"coupled control with fixed 1950's forcing (HighResMIP equivalent of pre-industrial control)\" (control-1950) experiment using the MPI-ESM1-2-XR model. See linked documentation for available information for each component.","keywords":"CMIP6, WCRP, climate change, MPI-M, MPI-ESM1-2-XR, control-1950, 6hrPlevPt, Amon, Eday, LImon, Oday, Ofx, Omon, SIday, SImon, day","inputDescription":null,"outputDescription":null,"softwareReference":null,"identifier_set":[]}